Home >  Term: basic IRR rule
basic IRR rule

Accept the project if IRR is higher than the discount rate; reject the project if it is lower than the discount rate. It is wise to also consider net present value for project evaluation.

0 0

ผู้สร้าง

  • Jessehe
  •  (V.I.P) 32013 points
  • 40.13% positive feedback
© 2024 CSOFT International, Ltd.