Home >  Term: rough order-of-magnitude estimate
rough order-of-magnitude estimate

An estimate done without detailed costing, or based on initial or incomplete data. It estimates the general size and scope of a project.

0 0

ผู้สร้าง

  • Romain
  •  (V.I.P) 17515 points
  • 44.44% positive feedback
© 2024 CSOFT International, Ltd.